Saturday 4 April 2015

Week 11 - Windows & Plumbing

Finally, after waiting about 2 weeks for the windows to arrive, and a week of them sitting in front of the house, the builders have finally begun installing the windows.  Very exciting, but very dirty! 

Here are some of the picks of the windows and plumbing completed this week.  

Front of the house:

Front Lounge Window:


Dining Room:

Lounge Room:

Sliding doors to the alfresco:

1st floor Rumpus: 

Rear Bedroom:

Ensuite Window (Over the bath):

Master Bedroom: Sliding Doors: 

Master Bedroom: 

Window (installed in the wall, waiting for the glass)

On the floor, the window for the staircase.

Master Shower:

From the side: 

The frame around the staircase needs to be adjusted as the window needs to be centred into the space.  This should happen next week.


Drainage pipes from the front balcony.  