Three months in to the actual construction and where does the time go!  

This week, all of our bricks were delivered to the site and the insulation was placed around the ground floor.  

Comically, we still don't have the final frame sign off; the window in the staircase needs to be centred, the rear garage wall is yet to be installed, a diminishing wall needs to be made and the landing at the top of the stairs needs to be fixed (it squeaks!).  

Additionally, our inspector has suggested 'Herring Bone' noggins to the ceiling joists to keep the long term movement of the 1st floor at a minimum.  

Next week, bricks!!!!!!